CNBM international formwork & scaffolding corporation
                      Omnibearing formwork service

 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsAluminum Beam Formwork

H20 Timber Beam with Cotton Plywood for Formwork Girder System

I'm Online Chat Now
Certification
China CNBM international corporation certification
China CNBM international corporation certification
My crew can work very quickly with the steel frame formwork system, because it has few different components.

—— Wisnu Prastomo

we were able to complete the construction both inexpensively and within the given time schedule.

—— Steffen Heidenreich

The CNBM formwork systems have opened up new possibilities for us.

—— Aitor Pablo Gorran

With the selected CNBM systems,operating sequences were accelerated whilst maintaining the high safety requirements.

—— Matthias Raab

The formwork is easy to clean and can be used very flexibly for walls columns and foundations.

—— Karl Stacheter

The CNBM formwork is the best system I have used so far for forming slabs.The elements are very light and the fast system.

—— Jean Luc Lignon

A large selection of available equipment and systems from CNBM offered us a competitive edge in this hot market.

—— Adam Arenivas

CNBM provided us with optimal solutions for all the problem areas and the systems can be used very flexibly

—— Jordi Mari

Compared to conventional panel formwork,I only need half the amount of time for shuttering using CNBM housing.This is a fantastic formwork system.

—— Heinz Gass

As a reliable,logistics partner we worked hand-in-hand with CNBM.We were able to complete the construction both inexpensively

—— Mauricio Mesias Jaime

The CNBM systems has opened up new possibilities for usI'm sure these will ensure that we achieve our goal ofcomplete and integrated formwork solution

—— Edwin lee Wee Ping

The system's high degree of adaptability allowed us to erect both shoring and slab formwork in the shortest time despite complicated building geometry

—— Oronzo Rampino

CNBM formwork was and will always be the best-you can say what you want.Anyone who knows anything about construction knows that.

—— Franz Xaver

The CNBM UP scaffolding adapted perfectly to the inclined form of the wall.This meant that safe and quick facade assembly was possible at every point.

—— Martin Vachal

We decided to use the CNBM system due to the very tight construction schedule.For construction of these floors,the CNBM is simply fantastic.

—— Jean-Marie Dolo

With the templates provided by CNBM,this was no problem whatsoever.The CNBM formwork fittde perfectly and could be put together without any effort.

—— Rainer Knodler

The extremely competent and detailed CNBM formwork made a decisive contribution to the effective completion and success of this construction project.

—— Josef Eich

Through the use of the CNBM systems,our site is a prime example of efficiency and safety.

—— Luis Redondo

Right from the beginning,the co-operation with CNBM and the service they procided could not have been better.

—— Torre Espacio

Formworking could be carried out quickly and efficiently with CNBM and,in particular,without the use of a crane.

—— Ji-Young Park

Already in the preparation phase,CNBM had provided us with the best formwork concept.

—— Rini bartens

I was already able to use the CNBM systems very successfully for my previous highrise projects.

—— Rodney O'Neill

The formwork is the safest and most efficient slab table system.Due to the lifting carriage,no workers are needde to oush the table to the slab edge.

—— Louie Tenaglia

The experience we had using proven CNBM systems in projects was also a decisive factor to renew our co-ciperation for the Naga Hammadi dam contract.

—— Andreas Poller

The high requirements placed om surface smoothness were able to be met without any problems.

—— Rico Schaarschmidt

The CNBM concept is technecally very sound and allowed us to save time and work extremety.

—— Florin Udrescu

H20 Timber Beam with Cotton Plywood for Formwork Girder System

large.img.alt
small.img.alt

Large Image :  H20 Timber Beam with Cotton Plywood for Formwork Girder System Get Best Price

Product Details:
Place of Origin: China
Brand Name: CMAX
Certification: ISO9001-2008
Model Number: TB20
Payment & Shipping Terms:
Minimum Order Quantity: One 20ft container
Price: Negotiation
Packaging Details: In bulk, bundle or according to the customer demand
Delivery Time: After deposit 15-20 days
Payment Terms: T/T L/C (bank transfer)
Supply Ability: 3000m/day 400pcs
Detailed Product Description
High Light:

formwork system

,

permanent formwork


1.glulam timber beam

2.reclaimed timber beam

3.concrete formwork construction


H20 Timber Beam with Cotton Plywood for Formwork Girder System


Description:

1. Structure sketch 

H20 Timber Beam with Cotton Plywood for Formwork Girder System 0


 

2. Related parameters

① Max. Allowable shear force: 40KN, Max. Design value: 11KN;

   Max. Allowable bending moment: 10KN·M, Max. Design value: 5KN·M.

② Max. Production length: 6600mm;

   Production capacity: 3000m/day;

   Weight: about 4.8kg/m;

   Moisture Content: about 13% ;

   Using time: about 4-5 years.


 

Competitive Advantage:

1. Standardized production line guarantees good products.

H20 Timber Beam with Cotton Plywood for Formwork Girder System 1


 

2. Finger jointing of the flange and web,the strength of timber beam is highly improved.

H20 Timber Beam with Cotton Plywood for Formwork Girder System 2

 

 


3. Well treated to prevent from water penetration or erosion, so the service life
maximally extended.

Normally, CMAX timber beam H20 can be used for 4 to 5 years, the exact using time is influenced by construction environment and the way to storage.

4. The length will be flexible, we can afford any length to meet customs’ demand within 6.6m limit.


H20 Timber Beam with Cotton Plywood for Formwork Girder System 3



Applications:

As a kind of girder, it is an important constituent part for formwork and it is widely used in concrete formwork construction.

H20 Timber Beam with Cotton Plywood for Formwork Girder System 4

 

Contact Details
CNBM international corporation

Contact Person: Miss. Only

Tel: 0086-10-57512543

Fax: 86-10-57512626

Send your inquiry directly to us