Hydraulic Climbing Formwork System is with reasonable structure, economic and practical, high standardization degree, etc. In one template, plywood and vertical rib (Timber Beam) are connected by self-drilling screws and flooring nails, vertical ribs and cross rib(Double Channel Waling) are connected by flange clamp, setting one lifting hook in both vertical ribs symmetrically. Connecting 2 templates by formwork element connector, and fix it by wedges. So as to ensure the integrity of formwork, and then make the template stress more reasonable and reliable. Timber Beam Straight Wall Formwork belong to a removable formwork system, so its assembly is convenient, and can be assembled into variety of sizes within limit. To be specific, there are some advantages of Hydraulic Climbing Formwork System as below:
1. Poured wall surface effect is good. Seam between two layers is better.
2. Timber Beam Formwork System is better for maintenance of concrete surface. During the pouring procedure, templates absorb moisture from the concrete(template won’t be distort in the procedure). In the later procedure of concretion, templates release moisture. It is very beneficial for the whole procedure of concrete pouring.
3. Timber Beam Formwork System can adopt plywood or visa plate as deck. Timber beam at the back is go through special processing, and connected into a whole with Channel Waling. This type of formwork is helpful for concrete heat preservation of construction in Winter.
4. Power source of Climbing Formwork is from its self hydraulic jack-up system. No need for tower crane, bracket lift in a whole and can keep common tools on itself. It saves human resource and material resource greatly, and improves construction efficiency, quality and safety.
5. Stress effect of Climbing Bracket is very good. Adopting double anchor plates, shear resistance of single bracket is not lower than 15 ton. It guarantees the safety of high altitude construction.
6. Brackets around cable bent tower are in a loop, which form a closed platform (six layers in all from top to bottom, convenient for construction in each layer), then ensure the safety of working high above ground, improve work efficiency by connecting every platform. It is helpful for binding rebar on the top platform.
Contact Person: Miss. Only
Tel: 0086-10-57512543
Fax: 86-10-57512626