CNBM international formwork & scaffolding corporation
                      Omnibearing formwork service

 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home News

How to Choose the Suitable Construction Formwork

I'm Online Chat Now
Certification
China CNBM international corporation certification
China CNBM international corporation certification
My crew can work very quickly with the steel frame formwork system, because it has few different components.

—— Wisnu Prastomo

we were able to complete the construction both inexpensively and within the given time schedule.

—— Steffen Heidenreich

The CNBM formwork systems have opened up new possibilities for us.

—— Aitor Pablo Gorran

With the selected CNBM systems,operating sequences were accelerated whilst maintaining the high safety requirements.

—— Matthias Raab

The formwork is easy to clean and can be used very flexibly for walls columns and foundations.

—— Karl Stacheter

The CNBM formwork is the best system I have used so far for forming slabs.The elements are very light and the fast system.

—— Jean Luc Lignon

A large selection of available equipment and systems from CNBM offered us a competitive edge in this hot market.

—— Adam Arenivas

CNBM provided us with optimal solutions for all the problem areas and the systems can be used very flexibly

—— Jordi Mari

Compared to conventional panel formwork,I only need half the amount of time for shuttering using CNBM housing.This is a fantastic formwork system.

—— Heinz Gass

As a reliable,logistics partner we worked hand-in-hand with CNBM.We were able to complete the construction both inexpensively

—— Mauricio Mesias Jaime

The CNBM systems has opened up new possibilities for usI'm sure these will ensure that we achieve our goal ofcomplete and integrated formwork solution

—— Edwin lee Wee Ping

The system's high degree of adaptability allowed us to erect both shoring and slab formwork in the shortest time despite complicated building geometry

—— Oronzo Rampino

CNBM formwork was and will always be the best-you can say what you want.Anyone who knows anything about construction knows that.

—— Franz Xaver

The CNBM UP scaffolding adapted perfectly to the inclined form of the wall.This meant that safe and quick facade assembly was possible at every point.

—— Martin Vachal

We decided to use the CNBM system due to the very tight construction schedule.For construction of these floors,the CNBM is simply fantastic.

—— Jean-Marie Dolo

With the templates provided by CNBM,this was no problem whatsoever.The CNBM formwork fittde perfectly and could be put together without any effort.

—— Rainer Knodler

The extremely competent and detailed CNBM formwork made a decisive contribution to the effective completion and success of this construction project.

—— Josef Eich

Through the use of the CNBM systems,our site is a prime example of efficiency and safety.

—— Luis Redondo

Right from the beginning,the co-operation with CNBM and the service they procided could not have been better.

—— Torre Espacio

Formworking could be carried out quickly and efficiently with CNBM and,in particular,without the use of a crane.

—— Ji-Young Park

Already in the preparation phase,CNBM had provided us with the best formwork concept.

—— Rini bartens

I was already able to use the CNBM systems very successfully for my previous highrise projects.

—— Rodney O'Neill

The formwork is the safest and most efficient slab table system.Due to the lifting carriage,no workers are needde to oush the table to the slab edge.

—— Louie Tenaglia

The experience we had using proven CNBM systems in projects was also a decisive factor to renew our co-ciperation for the Naga Hammadi dam contract.

—— Andreas Poller

The high requirements placed om surface smoothness were able to be met without any problems.

—— Rico Schaarschmidt

The CNBM concept is technecally very sound and allowed us to save time and work extremety.

—— Florin Udrescu

Company News
How to Choose the Suitable Construction Formwork

Nowadays,construction formwork can be seen everywhere in the building industry.But there are so many different types of construction formworks,then it becomes very important to choose the most suitable construction formwork for your project.

 

Such a broad scope of application also strictly requires the quality of construction formworks,which will directly affect the quality of the project.High-quality construction formwork can be reused by many times,while some cheaper formworks could only be used by two or three times.In contrast, the high quality construction formworks are much more reasonable.So,how to choose the most suitable construction formwork?

 

According to the suppliers of OKorder building material,you may take the following aspects into consideration:

 

1. For the floor slab construction formworks, recommending the multi-layer boards formworks.This kind of construction formwork will appear the damage in the edge section after many times use.To ensure the edge section is flat and doesn’t affect the construction progress,the damage parts must be cut timely to guarantee the normal function of the construction formwork.

2. It’s easily adopted to use construction formworks in medium-sized combination for the buildings with beam and column structure.Because for this kind of buildings, the cross-sections of beam and column change a lot.Using multi-layer boards formworks is not appropriate.The medium-sized combination could better fit in the complex structures of buildings with many beams and columns.

3. The construction formworks of medium-sized combination also can be used in wall formworks.This type of formwork could help to make the construction formwork in a high turnover level,which could save your cost a lot and make your construction work more efficient.

4. For core tubes of high-rise buildings,it’s better to use "hydraulic climbing construction formwork”.It can rise as floor by floor, which could quickly improve the construction speed.Although in aerial works,it is also very safe and do not need scaffoldings.

5. Recently,more and more new construction formworks have been invented.Among these formworks,the plastic construction formwork are widely used.This kind of formwork could be resued for fifty to sixty times,even more,it’s very light-weight.The plastic construction formwork is very suitable for projects which are not very high and don’t require strictly on the load-bearing.

 

Above factors could be considered when choosing the right construction formworkls for your own project.All in all,to select a proffesional construction formwork manufacturer worthy of your trust is very important.With state-owned background and decade years of experience in the field of construction formworks,we CNBM International Corporation is a good choice for you.

Pub Time : 2015-04-23 14:23:49 >> News list
Contact Details
CNBM international corporation

Contact Person: Miss. Only

Tel: 0086-10-57512543

Fax: 86-10-57512626

Send your inquiry directly to us